Trackgang nz120 layout

Used the last 2 days to do some work on the nz120 scale layout. Decided to relocated the road crossing away from the end of the module as it had created derailments with rolling stock. Firstly cut out the old crossing and remove some of the track. Trimmed away the old road surface ready for scenic work. Pieces of cork strip were glued either side of the track road bed yesterday. Second photo shows first rough plaster fill done today for the new road bed. Plaster has been pre-coloured. After rough shaping I’ll do a top plaster road surface. Next job was to glue the side railing to the road overpass bridge featured on another corner module. Then the continuing saga of farm fencing on the rural corner module. 2 afternoons of planting posts and battens. Not going to string wires, just paint and bury in long grass.

One Reply to “Trackgang nz120 layout”

Leave a Reply